Professional Linear Accelerator Dismantling Process Explained



Linear accelerator dismantling is a highly specialized engineering process that requires experience, precision, and strict safety procedures. Improper dismantling can result in serious risks, including equipment damage, structural damage, and safety hazards.


This guide explains the step-by-step LINAC dismantling process used in professional radiotherapy engineering projects.





WHAT IS LINAC DISMANTLING?



LINAC dismantling refers to the controlled disassembly of a radiotherapy system for:


  • Decommissioning

  • Relocation

  • Disposal



It involves both mechanical and electrical engineering operations.





STEP 1: SITE ASSESSMENT



Before dismantling begins, a detailed site inspection is performed.



Includes:



  • Bunker structure analysis

  • Access route evaluation

  • Equipment condition

  • Risk assessment



A custom dismantling plan is created.





STEP 2: SAFETY PREPARATION



Safety is the most critical stage.



Procedures:



  • Radiation safety checks

  • Power shutdown

  • Lockout/tagout systems

  • Work area isolation



Only trained engineers should perform this step.





STEP 3: SYSTEM SHUTDOWN



The LINAC system is safely powered down.


  • Electrical disconnection

  • Control system shutdown

  • Safety verification






STEP 4: ELECTRICAL DISMANTLING



Electrical components are removed first.



Includes:



  • Control cabinets

  • Cabling systems

  • Interface panels



This reduces risk during mechanical dismantling.





STEP 5: MECHANICAL DISMANTLING



The most critical phase.



Components removed:



  • Treatment head

  • Gantry

  • Base frame



Special lifting equipment is required.





STEP 6: ACCESSORY REMOVAL



  • Patient couch

  • Imaging systems

  • Accessories






STEP 7: INTERNAL TRANSPORT



All parts are safely moved out of the bunker.


  • Controlled lifting

  • Protected transport routes






STEP 8: PACKAGING & TRANSPORT



If relocation is planned:


  • Equipment is packed

  • Prepared for shipping






STEP 9: SITE CLEARANCE



  • Area cleaning

  • Waste removal

  • Final inspection



The room is prepared for new installation.





WHY PROFESSIONAL DISMANTLING IS IMPORTANT



Improper dismantling can lead to:


  • Safety risks

  • Equipment damage

  • Legal issues



Professional engineers ensure safe and efficient execution.





HHC Medical Engineering



Radiotherapy & Radiology Engineering Solutions


📍 Istanbul – Turkey

📞 +90 532 224 10 29

 
 
 

Son Yazılar

Hepsini Gör
HOW TO REMOVE A LINEAR ACCELERATOR SAFELY

Complete Safety Guide for LINAC Removal Removing a linear accelerator is one of the most complex operations in medical engineering. It involves radiation safety, heavy equipment handling, and regulato

 
 
 
LINAC REMOVAL COMPANY EUROPE

Professional Linear Accelerator Decommissioning, Dismantling & Relocation Across Europe Radiotherapy centers across Europe are rapidly upgrading their technology to improve treatment quality and patie

 
 
 
VARIAN LINAC REMOVAL COMPANY FRANCE

Professional Linear Accelerator Decommissioning Services in France France has one of the largest radiotherapy infrastructures in Europe, with both public hospitals and private oncology centers continu

 
 
 

Yorumlar


bottom of page